Plan Over Winter, Build in Spring: Why Autumn Is the Time to Start Your Extension Drawings

Spring and summer are when most people start thinking seriously about an extension or loft conversion. The trouble is, by then it’s often too late to get building that year. If you’d like work on site next spring or summer, autumn and winter are when the groundwork really happens: on paper.

Why projects take longer than people expect

Between deciding you want an extension and a contractor starting on site, there are several stages:

  • A measured survey of your existing property
  • Design development, working through layouts and options until you’re happy
  • A planning application, if one is needed, which usually takes around eight weeks for a decision once the council has validated it
  • Building regulations drawings, the detailed technical information needed for approval and for a contractor to build from
  • Getting quotes from contractors, who often book up months ahead for the spring and summer

Put together, it’s common for this to take several months. Starting in autumn means you can reach spring with drawings ready, approvals in hand and contractors lined up.

The advantages of starting now

More time to get the design right. There’s no pressure to rush decisions. You can live with the design, change your mind, and refine it properly.

Fewer delays at the planning stage. Councils are often busier in spring and summer. Submitting earlier gives you a better chance of a decision before the building season starts.

First pick of contractors. Contractors’ diaries fill up quickly for warmer months. Having construction-ready drawings early means you can get quotes and book a start date before the best slots go.

Clarity on costs. Detailed drawings let contractors give accurate quotes, so you know where you stand before committing.

A note on fees and regulations

Planning application fees rose significantly in April 2025, when the fee for a householder application for an extension went up to £528, and they increased again in line with inflation from 1 April 2026. It’s worth factoring fees into your budget early, along with any other costs your project involves.

It’s also worth being aware that updated building regulations, the Future Homes Standard, come into force on 24 March 2027. We’ve written about what that means for your project.

Not sure if you need planning permission?

Many extensions and loft conversions fall under permitted development and don’t need a full planning application, but it depends on your property and what you’re proposing. For an initial look at the planning constraints that may apply, try our Project Checker, or read our guide to the planning application process in Leicester.

Getting started

We take projects from concept through to construction-ready drawings, from the first measured survey through to planning and building regulations. If you’d like to be building next spring, get in touch and we’ll talk through your plans and a realistic timeline.

This article is general information only and isn’t planning or legal advice. Requirements depend on your property and the work proposed.